Help › Capture › Tasks

Locate a task and create drawing markers (drawing-based working)

In brief: a drawing marker locates a task exactly where it belongs on the PDF drawing (drawing-based working). That makes it visible at a glance where on site something has to be done. You can create the entry either as a standalone task or as a record entry.

Prerequisites: Smart and Expert users place drawing markers. Viewers and Teamworkers do not place drawing markers; they only see and comment on their own. The drawing must be in drawings & documents — placing is not possible on drawings in the upload folder or in short records.

Goal

You want not only to describe a task but to locate it exactly on the drawing — “socket missing” right at the wall where it is missing, for example. The drawing marker ties the task firmly to a position on the PDF drawing. That way the authorised people in the project team find the task later at the right place.

Place a drawing marker on the drawing

This is how you locate a task directly on the drawing:

  1. Open the drawing you want in drawings & documents.
  2. Choose Locate task.
  3. Decide whether you want to create the entry as a task or as a record entry.
  4. Place the marker where you want it on the drawing.
  5. Confirm the position — alternatively move or delete the marker.
  6. Enter the task. How to describe a task in detail is in Capture and edit tasks.
In the opened drawing, click the task symbol in the toolbar at the bottom to locate a task. Confirm the marker position with the tick or discard it with the cross.

Move or delete drawing markers

While the task is open you can adjust the marker at any time: drag it to a new position or delete it.

Exception: markers pointing to an already closed record entry can no longer be moved.

Note: drawings with markers cannot be deleted. With a new drawing version the marker is carried over into the new drawing.

Find drawing markers again

This is how you find markers you placed:

  1. Open the drawing.
  2. Use search or open the filters to jump to the marker you want.

Result

The task is now firmly linked to a position on the PDF drawing. Internal users with a Smart or Expert licence who are in the project team see all markers; Viewers and Teamworkers see only their own. Every authorised person sees directly on the drawing where something has to be done.

Tips and common mistakes

  • No batch mode: there is no batch mode for drawing markers — the marker must always be placed between creating tasks. With the apply details checkbox, entry details (the company, for example) can be carried over into the next marker.
  • Wrong storage location: you cannot place markers on drawings in the upload folder or in short records. Move the drawing to drawings & documents if needed.
  • Marker cannot be moved: the related record entry is already closed.
  • Overlapping markers: if several markers sit very close together they can cover each other on the drawing (the tasks can be selected in the list).

FAQ

Can I locate a task directly on the drawing?

Yes. Open the drawing in “drawings & documents”, choose “locate task” and place the marker where you want it.

Why can't I place a drawing marker on this drawing?

Placing is not possible on drawings in the upload folder or in short records. Move the drawing to “drawings & documents”.

Is there a batch mode for drawing markers?

No. The marker must always be placed between creating tasks; with the “apply details” checkbox, entry details (the company, for example) can be carried over into the next marker.

Can I move a drawing marker afterwards?

Yes, as long as the related record entry is not closed. Markers for closed records can no longer be moved.