Create, copy and send the daywork sheet
In brief: with a daywork sheet you document additional work or other material that the client must accept — including client, “ordered by”, personnel deployed, material and machines. You load the weather data automatically, sign digitally and send the report as a PDF. Every report is stored automatically in drawings & documents.
Which report is the right one?
The comparison of daywork sheet, daily report and site diary is in Create, copy and send the daily report.
Prerequisites: daywork sheets are included from the Smart licence and are also available to Expert users. Alternatively there is the reports add-on (daily report, daywork sheet and site diary) in combination with a Viewer licence (not for Teamworkers) — ideal for foremen who only capture reports. The add-on requires at least one Smart or Expert licence in the account and is booked by new customers in the app, by existing customers by email.
When do I use a daywork sheet?
A daywork sheet documents additional work or other material that the client must accept — additional work ordered at short notice, or daywork due to construction damage, for example. The regular work that is signed off, by contrast, you document in the daily report. You record who ordered the work and which personnel, material and machines were deployed, creating a traceable basis for billing.
Create or copy a daywork sheet
In the burger menu click daily report. There, in the dropdown at the top, click daily report and select daywork sheet. With the plus symbol at the bottom right you create a new daywork sheet or copy an existing one.
Note: as soon as you create a daywork sheet it is assigned automatically to the respective calendar week.
Capture general information
In the header of the daywork sheet you record:
- construction phase
- date
- editor
- client
- ordered by
- trade
- internal number
- construction damage (whether the daywork was ordered because of construction damage)
- weather
Load weather data automatically
Clicking load weather data determines the weather automatically from the date and project address. If no or only an incomplete project address is stored, no weather can be loaded. All details are in Create, copy and send the daily report.
Document details
On the right you capture the actual daywork. In all areas you can attach files, choose attachments from drawings & documents or take photos directly. For several similar entries use batch mode (checkbox at the bottom left).
Note: attachments are limited to a maximum of 10 files per entry (per material or activity, for example).
Personnel
In the daywork sheet you select your own employees individually and add them (not as a group total). Assign each person the appropriate employment group (professional qualification, for example skilled worker). Optionally capture personnel number, hours and salary allowances. Salary allowances are hardship allowances for which employees receive more money. If an employment group or salary allowance is missing, add it in the report settings.
Activities
Capture a free text, the location and the hours required.
Other / special incidents
Free text without a length limit for special events.
Material / delivery notes
Record free text, supplier, quantity, unit and optionally a delivery number. You choose the supplier from your contact list — the company must be assigned to the project. Tip: photograph delivery notes directly in case the paper slip gets lost.
Machines / equipment
Capture a description, the number of devices and the duration of use.
Send and sign the daywork sheet
Click the paper plane at the top left to sign and send the report. Sending runs in three steps: distribution list, additional functions (with the “preview” button, the “sign report” checkbox and the download link for attachments) and send email (optionally with the “close report” checkbox next to the send button; a subject is not required). In the daywork sheet you sign by hand in the sketch field; after signing in the preview click “next”. All details on sending are in Create, copy and send the daily report.
Find finished reports
Every sent report is stored automatically in drawings & documents under created PDF documents > daily reports; daywork sheets sit below. If no report exists yet, the folders are greyed out.
View sent reports: who a report was sent to by email is shown in the overview of sent emails (menu “drawings & documents”).
FAQ
Can I find daywork sheet entries via the global search & filters?
No, that is not currently possible. The entries of the reports are not searchable in the cross-project search — the feature is known to the product team and is to be added in future.
What is the difference between the daywork sheet and the daily report?
In the daywork sheet you document additional work or other material that must be accepted; in the daily report the regular work that is signed off. Details in Create, copy and send the daily report.
Is the report assigned to the right calendar week?
Yes. When created, the daywork sheet is assigned automatically to the matching calendar week.
Can I have the report signed digitally?
Yes. When sending, enable the “sign report” checkbox and sign by hand in the sketch field.
Can the client sign the daywork sheet?
Yes. The client signs at the end because they approve the report. Enable the “sign report” checkbox in the “additional functions” step.
Keywords: daywork sheet