Help › Best Practices › Construction Documentation

Create a handover record — sample under VOB and ÖNORM

Legal notice: the samples and formulations shown here serve exclusively as non-binding examples. They were created after careful research (online sources and AI support), do not come from a lawyer and do not replace legal advice. For legally binding formulations, seek qualified legal advice.

A handover record documents the formal handover of a building or an apartment from the contractor to the client. In BauMaster you create it as a record with the appropriate entries, and store recurring text blocks as your own template. Below you find a non-binding sample — for the German (VOB/B, BGB) and the Austrian legal area (ÖNORM B 2110, ABGB) respectively. If your project follows a different legal framework, use the structure above and adapt the wording to your contract.

Contents of a handover record

A complete handover record usually contains the following chapters, which you create as record entries in BauMaster:

  • details on warranty (basis and period)
  • contracting parties (apartment owner, client and contractor, for example)
  • defects found at handover
  • reservations of the client
  • objections of the contractor
  • key handover
  • meter readings (electricity, water, gas, heating)
  • other agreements

Germany: handover under VOB/B

Formal handover is governed by § 12 VOB/B and § 640 BGB, warranty by § 13 VOB/B. In the sample the basis is stated as “§ 12 & § 13 VOB/B” with a warranty period of usually several years. The record counts as complete once it has been signed by client and contractor or their authorised representatives.

A ready-made formulation is available in the template “Formal handover (VOB/B § 12, BGB § 640)” — see Text templates for PDF records.

Austria: handover under ÖNORM B 2110

Formal handover is governed by ÖNORM B 2110 (and § 1170 ABGB) and is part of the so-called formal acceptance. It counts as complete once it has been signed by client and contractor or authorised representatives. In the sample the warranty is stated as “ÖNORM B 2110” with a period of three years; the warranty period starts on the date of handover.

A ready-made formulation is available in the template “Formal handover (ÖNORM B 2110, ABGB)” — see Text templates for PDF records.

Save as a PDF template

You store the recurring chapters and formulations once as your own template in the opening text or the closing text of your record (Expert licence required). The template is then available for all future handovers. The step-by-step guide is in Text templates for PDF records.

FAQ

How do I create a handover record in BauMaster?

Create a record of the record style you want and capture the chapters above as entries. Store recurring texts as a template in the opening or closing text of the record. How to create records is described in Records: overview, creating, copying and deleting.

Are there ready-made text templates for the handover?

Yes. BauMaster includes templates for formal handover under VOB/B (Germany) and under ÖNORM B 2110 (Austria). An overview of all templates is in Text templates for PDF records.