Important terms in BauMaster
In brief: This article is the reference for BauMaster terms you meet in the app and in the online help. All terms around licences, roles and permissions — Expert licence, Smart licence, Viewer, Teamworker, reports add-on, admin, user, employee, contact and company account — are explained in Licences, roles & permissions. Here you find the remaining terms, and the list of terms no longer in use.
1. Terms in the app
| Term |
Meaning |
| Dashboard |
The start view after signing in, with your tasks and entries. Also called “my tasks” or “start screen”. |
| Burger menu |
The menu with the main BauMaster functions — records, drawings & documents (project room) or search & filters, for example. |
| Account menu |
The menu at the top right. It takes you to your user settings and — as an admin — to the admin settings. |
| User settings |
Your personal settings: login details (email, reset password), my user (user data: user name, role, licence, add-on), email signature. Under “my settings” you also find display & language, manage devices and security (2FA). |
| Admin settings |
The settings for the whole company account — admins only: global settings (required fields), logo & design, account & billing details, AI settings, report settings (employment groups, salary allowances) and integration & API (SharePoint, BauMaster MCP). |
| Employment group |
A person’s professional qualification in the daily report, daywork sheet and site diary. Admins define it in the report settings. |
| Salary allowances |
Hardship allowances paid on top (more money). Selectable in the daywork sheet; admins define them in the report settings. |
| Traffic light |
The coloured symbol showing the status of an entry or a task. Green = done, amber = to review, red = open — hence “traffic light”. It shows you at a glance what is open, to review or done. |
| Short view |
The reduced view of an entry with the most important fields. It expands to the full view. |
| Type |
The tag (category) of an entry or a task — task, info or defect, for example. Type and status both belong to the entry or task. |
| Entry |
A single line in a record, for example a defect or an observation. |
| Task |
A point to be completed with responsible person, date and status. |
| Trade |
A specialist or work area of a construction project (structural work, electrical) with its own colour. You assign trades to tasks, record entries and work items in the construction schedule — to mark and filter them, in search & filters, in project costs or in the construction schedule. |
| Seen status |
Shows for records whether a recipient has seen the record. |
| Download status |
Shows for PDF drawings whether a drawing was downloaded. |
| Drawing marker |
The location of an entry or a task directly on the PDF drawing. |
| Drawing task |
A way to document something on a drawing: it is linked to a task (“task on the drawing”). One of four options on the drawing: drawing task, drawing entry, drawing comment and photo marker (see section 3). |
| Drawing entry |
A way to document something on a drawing: it is linked to a record entry (“entry on the drawing”). Always the individual entry is located, not the whole record. |
| Drawing comment |
A note at a place on the PDF drawing that sits on the drawing alone — without reference to a task or record entry (“comment on the drawing”). |
2. Terms around drawings and documents
| Term |
Meaning |
| Drawings & documents |
The product area holding all documents of a project: PDF drawings, PDF records, reports and photos. Also called “documents & drawings”; the area used to be called “project room”. |
| PDF drawing |
The individual drawing document as a PDF. |
| Drawing version |
A new state of an existing PDF drawing; markers can be carried over (Expert licence). |
| Upload folder |
The area where people with a free licence can upload PDF drawings. Must be activated by an Expert user. |
| Publish |
The “Publish” button makes a finally reviewed and approved PDF drawing public in the project team — as a new drawing or as a drawing version. Expert licence only. |
| Digital construction file |
The automatic store for all project documents, exportable as ZIP. |
3. Terms around photos
| Term |
Meaning |
| Photos & attachments |
The area in drawings & documents where all photos taken or attached in BauMaster are stored automatically. |
| Photo button |
The button at the top right for taking photos at any time — individually or in batch mode. These photos are not assigned to an entry. |
| Sketch |
The function (button “Sketch”) for sketching on photos: freehand sketches, text, arrows and markings. Directly after capture or later via the photo’s detail view. |
| Geotagging |
Automatically storing the device’s GPS coordinates when a photo is taken. |
| Map view |
The view showing photos with GPS coordinates on a map. |
| Photo marker / drawing photo |
The marker on the PDF drawing used to locate a photo at a specific place — without a task or record entry. “Drawing photo” is an equivalent term; in the app the action is called “locate drawing photo”. Photo markers initially sit only on the PDF drawing, without a link to a task or entry; a photo marker can later be converted into a task or a record entry. |
4. Terms around the construction schedule
| Term |
Meaning |
| Construction schedule |
The Gantt-based scheduling of a project — exactly one per project. |
| Construction phase |
A superordinate structuring level in the construction schedule. Can contain further construction phases (sections), work items and milestones. |
| Work item / sub-item |
A work step in the construction schedule — always “work item”/“sub-item” there, never “task”. Some work items are linked to a task or a record entry. |
| Milestone |
A fixed date in the construction schedule, for example “screed finished”. Possible on every level. |
| Dependency |
A link (arrow) between work items or construction phases — flexible (blue line) or fixed (red line). |
| Non-working days |
Public holidays from predefined calendars (Germany, Austria) and your own days off. They are taken into account for duration and dependencies. |
| Target/actual comparison |
Compares planned (target) and actual dates in the construction schedule; can be enabled per project. |
5. Terms around search, costs and BIM
| Term |
Meaning |
| Detailed search |
The search in “search & filters” across tasks and record entries — in the current project (preselected) or in further, manually added projects. Opened via the burger menu. |
| Gantt view (search) |
Search results shown on a timeline — only tasks and entries with a start and end date. Not a construction schedule of its own. |
| Individual record |
An option when sending PDFs from search: each contact in the distribution list receives only the tasks and entries assigned to their company and the project team. |
| Distribution list |
The contacts you send something to — a PDF record, a task or a PDF report from search & filters. |
| Recipient / recipient list |
The contacts that received a sent PDF record or email — this is what they are called in the retrospective view, for example in the seen column or in the overview of sent emails. |
| Project costs |
Evaluation of the additional and reduced costs from the “costs” field in tasks and record entries — with subtotals per company and the project’s tax rate (Expert licence). Export only as an Excel file via the cost view in search & filters — costs cannot be output as PDF. |
| BIM viewer |
Tool for opening 3D BIM models (.ifc, .rvt, .nwd) directly in the project. Uploading and editing only with an Expert licence. |
| BIM model / BIM version |
The uploaded 3D model, or a new state of it. The current and the previous model are stored. |
| BIM marker |
The location of a task or record entry on an element in the BIM model. |
6. Terms around records and reports
| Term |
Meaning |
| Daily report |
Report on the regular work on site (personnel and working hours, for example), which is signed off. |
| Daywork sheet |
Report on additional work or other material outside the regular scope, which has to be accepted. |
| Site diary |
Continuous documentation of construction progress by all companies on site. In Germany the site diary is mandatory. |
| Record |
A single document in BauMaster (often called “Bauprotokoll” in the past). A record is always assigned to a record style. |
| Record style |
Settings for one purpose (a site meeting, for example) so individual records can be created faster. Any user can create record styles. |
| Record type |
Short, standard or continuous: this sets whether a record is continuous (“continuous record”). The record type is not the same as the record style. |
| Record template |
A synonym for record style: real templates do not exist — through the record style you define settings and values that apply to all records of that style (something like a template), including structure and layout (a handover record then always looks the same). Also usable with a Smart licence. |
| Template record |
A single record of a record style that can be copied and thereby serves as a template (copy record). Not a separate feature. |
| Text template |
Predefined text for the opening or closing text of a record; you select it directly in the record (“own templates” or “BauMaster templates”). Expert licence only. |
7. Old terms: what is no longer used
If you see these terms in older documents, training material or videos — here is the current name:
| Old term |
Current term |
| Partner user, connected partner user, connected user |
Teamworker |
| Tenant (Mandant) |
Company account |
| Profile settings |
User settings |
| Menu top right |
Account menu |
| Express view |
Short view |
| Entry type |
Type |
| Bauprotokoll (in the app) |
Record |
| Header text, footer text, closing text, closing information |
Opening text, closing text |
| Crew |
Company or employee |
| PDF drawings & documents |
Drawings & documents |
app.bau-master.com, web.bau-master.com |
web2.bau-master.com |
Note on the term “Viewer”: the Viewer is a current, free licence for internal employees of your own company — not an old term. It is not the same as the Teamworker, which is intended for external partners. Functionally, both can do the same.
Keywords: important terms BauMaster