The trades play the most important role in construction phase planning, alongside the date. Therefore, the trades are intelligently set up in the BauMaster application in the overview of all project settings.
Trades in Project Settings (Quick Overview)
In the project settings, you can activate individual trades for the desired project and assign them a color.
1. Activate trade
Set the slider to yellow
2. Edit trade and change color
Click on the trade to edit it
Click on the color to open the color picker tool and select the desired color for the construction schedule. Use the small arrows in the bottom right to switch between RGB, HLS, and HEX color modes, or use the eyedropper tool to pick a color from anywhere in your browser window.
Trades in the Construction Schedule
1. Colors of Trades in the Construction Schedule
Whether you change the color in the project settings or when creating phases and tasks:

You can change the color anywhere. The color applies to the trade across all projects.
2. Assign trades to all construction phases and tasks
Click on the plus icon in the top right or within individual construction phases and tasks to define additional phases, tasks, or milestones. You can assign a trade as needed, e.g., exterior facilities.

Reminder: The construction schedule has up to five levels - you can define a specific trade for each level! (Construction phase > Construction phase > Task > Subtask >
3. Filter by trades
Using the funnel icon in the icon bar, you can filter construction phases, tasks, and milestones for specific trades.

Important: If you have assigned a trade to a task but not to its subtask, the subtask will not be displayed when you apply the filter!

When a trade filter is active, you can recognize this by the grey-highlighted funnel icon.